NGCP Power Interruption from October 21-22, 2021
As announced by the Benguet Electric Cooperative (BENECO), here are areas in Baguio City and Benguet that will be affected by scheduled power interruptions by NGCP from Thursday, October 21 to Friday, October 22, 2021.
NGCP Power Interruption
Date and Time | Areas Affected | Purpose |
---|---|---|
October 21, 2021 Thursday 7:00 AM to 7:30 AM | Whole of Buguias EXCEPT: - Natubleng - parts of Amgaleyguey (Sinipsip, Sepadan, Pakpakitan) Whole of Mankayan Whole of Bakun Parts of Cervantes, Ilocos Sur | To facilitate closing of Air Break Switch, AB(5LI1LTR-LEP)MNY- LEP001 <50BU5> and opening of Load Break Switch, LB(5LI1LTR- SGD) MNY-SGD001 <50BU03> for the shifting of BENECO Mankayan, MOPRECO & Hedcor Sabangan loads from 5LI1LTR-SGD |
October 21, 2021 Thursday 7:00 AM to 5:00 PM | Whole of Tublay EXCEPT: - parts of Tuel and Caponga (from Tollgate to Winaca) Whole of Kapangan Whole of Kibungan EXCEPT: - Tacadang - Palina Whole of Bokod EXCEPT: - Ambuklao - Bobok-Bisal Whole of Kabayan Whole of Bakun EXCEPT: - Kayapa Parts of Buguias: - Natubleng - Amgaleyguey (Sinipsip, Sepadan, Pakpakitan) | To implement the following maintenance activities along La Trinidad- Mankayan (Sagada) 69kV Line Segment: a. Installation of line arrester counters at Tower Nos. 007, 046, 085, 102, 113, 119. b. Replacement of damaged insulators (with signs of flashover) at Tower Nos. 009, 021, 049, 054, 056, 088. c. Correction of punch list at Tower 76 (by contractor). Note: 1. Normalization of the La TrinidadMankayan 69kV Line Segment thru closing of CB04(5LI1LTRSGD)LTR <1600H (04:00PM) to 1700H (05:00PM)> 2. BENECO Mankayan SS will remain energized thru La Trinidad Lepanto 69kV Line |
October 22, 2021 Friday 7:00 AM to 7:30 AM | Whole of Tublay EXCEPT: - parts of Tuel and Caponga (from Tollgate to Winaca) Whole of Kapangan Whole of Kibungan EXCEPT: - Tacadang - Palina Whole of Bokod EXCEPT: - Ambuklao - Bobok-Bisal Whole of Kabayan Whole of Bakun EXCEPT: - Kayapa Whole of Buguias Whole of Mankayan Parts of Cervantes, Ilocos Sur | To facilitate opening of Load Break Switch, LB(5LI1LTR-LEP)MNY- LEP002 <50BU07> and closing of Load Break Switch, LB(5LI1LTR-SGD)MNY-SGD001 <50BU03> for the shifting of BENECO Mankayan, Lepanto Mines, MOPRECO & Hedcor Sabangan loads from 5LI1LTRLEP to 5LI1LTR-SGD. Note: 1.(5LI1LTR-LEP)LTR-MNY < La Trinidad-Mankayan(Lepanto)> scheduled for line maintenance from 0700H(07:00AM) to 1700H (05:00PM) a. Installation of line arrester counters at Tower Nos. 007, 102, 113, 119. b. Replacement of damaged insulators at Tower Nos. 009, 021, 033, 049, 050, 051, 053, 054, 055, 088 c. Check & repair damaged loop conductor (Ph B) at Tower 033 d. Correction of punch list at Tower 76 (by contractor). |
4:00 PM to 5:00 PM | To facilitate normalization of loads thru closing of Load Break Switch, LB(5LI1LTR-LEP)MNY-LEP002 <50BU07> and opening of Air Brake Switch, AB(5LI1LTR-LEP)MNY-LEP001 <50BU5> for the shifting of Lepanto Mines load from 5LI1LTR-SGD |
Cable & Communication Companies
In BENECO’s advisory, all concerned Cable & Communication Companies are advised to inspect and institute necessary safety measures or actions on their cables or lines attached to the affected BENECO poles.
For other questions and concerns:
For more information and concerns, contact BENECO at any of these numbers:
- LANDLINE: 637-4400 local 605 to 607
- SMART: 09088657202
- GLOBE: 09175921698
For More News and Updates
Looking for more news and updates? Feel free to explore our BCG website and our official Facebook page. You may also check out our official BCG YouTube channel to catch a variety of video content.
SOURCE: BENECO
How do you feel about this?
Happy
0
Sad
0
Shocked
0
Not Sure
0