Baguio City NewsBenguet NewsFAQsLocal News

Baguio City BENECO Power Interruption Schedule: Feb 9-14, 2026

UPDATE May 20, 2026 10:55 AM:


(adsbygoogle = window.adsbygoogle || []).push({});

As announced by the Benguet Electric Cooperative (BENECO), here are areas in Benguet that will be affected by scheduled power interruptions by BENECO from Monday, February 9, 2026, to Saturday, February 14, 2026.
(function(){var s=document.querySelector(‘script[data-playerPro=”current”]’);s.removeAttribute(“data-playerPro”);(playerPro=window.playerPro||[]).push({id:”z2I717k6zq5b”,after:s,appParams:{“C_NETWORK_CODE”:”23018154962″, “C_WEBSITE”:”baguiocityguide.com”}});})();

BENECO Power Interruption (February 9-14, 2026)

Areas AffectedPurpose
February 9, 2026
Monday
9:00 AM to 5:00 PM
Whole of Mankayan
except Taneg and
Guinaoang
Replacement of fuse
assemblies

Installation of
intermediate poles to
improve line clearance

Installation of smart
arresters
SABLAN:
Parts of Lexber Homes
Metro Baguio
Subdivision,
Banangan
Reconductoring of
secondary lines to #4/0
ACSR coated
BAGUIO CITY:
Parts of Fairview
(Avelino St.,
including Rainbow
Hills Subdivision),
parts of Campo
Filipino (Roman Ayson
Rd., part of Sixto
Gaerlan St.) and
parts of Ferguson Rd.
(from Sudzee Laundry
Shop to Petron)
Replacement of sole-use
distribution
transformers
February 10, 2026
Tuesday
9:00 AM to 5:00 PM
TUBLAY:
Sitio Tabeyo Ambassador
Facilitate tree cutting and
ROW clearing
BOKOD:
Sitio Ambayek, Poblacion
Replacement of
damaged primary pole
BOKOD:
Otbong, Bobok-Bisal
Replacement of wooden
secondary pole
ITOGON:
Parts of Virac
(Keymen's Hill,
Kiangan Village,
Camp Suerte, Camp 6,
Camp 5)
Upgrading of poles and
primary extension
BAGUIO CITY:
Parts of Pinewoods
Subdivision
(Engelmann,
Juniper, Balsam,
Spruce Bend, Cedar
Loop, Sierra Bend, Yew
Road, Sago, Cypress
Bend, part of Conifer
Drive), Sta. Lucia
Energization of
secondary lines and
relocation of service
drops
BAGUIO CITY:
Parts of San Luis village
(Dahlia St., and areas
near San Luis Village
Barangay Hall)
Relocation of secondary
lines affected by
ongoing construction
LA TRINIDAD:
Parts of Km.5
(Fangonil Street.,
including Trading
post and areas near
Provincial Health
Office), Pico
Restructuring of primary
assemblies for
primary extension
BAGUIO CITY:
Part of Teachers Camp
(areas near
Administration office
and cottages)
Replacement of
damaged secondary pole
February 11, 2026
Wednesday
9:00 AM to 5:00 PM
BAGUIO CITY:
Parts of Pinsao Pilot
Project (parts of
Purok 1, Purok 2,
Purok 3, Purok 6,
Purok 7, including
areas near Pinsao
National High School)
and part of Riverside,
Guisad
Central
Reconfiguration of lines
for primary extension
LA TRINIDAD:
Parts of Km 4. (from
BIR to Tiongsan)
Replacement and
correction of leaning
secondary pole
BAGUIO CITY:
Parts of Loakan Proper
(Pongian, Ongasan,
Mangga, Suyoc,
Arupong, Demo Mines,
Cliff Drive, Maxicar,
Sadjo), parts of Camp
7 (areas from Satellite
Market until Lion's
Head, part of Pias
tapped at Satellite,
Youngland);

TUBA:
Parts of Camp 4
(Camp 6, La-aw,
Millsite, Hilltop,
Riverside, Hydro 1,
City Limit)
Relocation of poles
affected by DPWH
Project

Replacement and
correction of leaning
primary pole
February 12, 2026
Thursday
9:00 AM to 5:00 PM
BOKOD:
Sitio Penged and
parts of Abiyo, Daclan
Replacement of wooden
primary poles

Extension of underbuilt
secondary lines
BAGUIO CITY:
Parts of Upper General
Luna (Brent Rd.,
Yangco Rd.,
Laubach Rd.),
parts of Salud Mitra
(along Upper Gen.
Luna Rd.), and
parts of Holy Ghost
Proper (Sumulong St.
tapped at Yangco Rd.)
Relocation of primary
pole affected by
ongoing construction
ITOGON:
Loacan (Tocmo,
Tollibeng, Labilab,
Sabkil, Anteg-in,
Marooc, Peday,
Camisong, Apalan),
parts of Tinongdan
(Guisset)
Facilitate massive
clearing

Rerouting of
secondary lines
affected by
ongoing construction
BOKOD:
Ambuklao (Banao,
Minac, Lebeng,
Adonot, Hilltop,
Sombrero, Ambangol)
February 13, 2026
Friday
9:00 AM to 5:00 PM
BAGUIO CITY:
Parts of Smith Drive
(Visperas Store to
Shano Sari-Sari Store),
Whole of Purok 6
Dumpsite (Gold Alley,
Diamond Alley, Silver
Alley, Bronze Alley)
Relocation of secondary
lines affected by
ongoing construction
BAGUIO CITY:
Parts of Holyghost
Extension (areas from
Holy Grace Apartment
to Shine Store near
Honeymoon Rd.)
Relocation of scondary
pole affcted by
proposed construction
BAGUIO CITY:
Parts of Honeymoon -
Holy Ghost (parts of
Purok 6 and areas
along Honeymoon
Road, from Megatower
Residences towards
Maymay Store,
including Barangay
Hall)
Relocation of primary
pole affected by
ongoing construction
LA TRINIDAD:
Parts of Balili (parts of
Pinespark, Tebteb) and
parts of Inselbeg, Lubas
Installation of
distribution
transformer and
rerouting of lines due
to load splitting
February 14, 2026
Saturday
9:00 AM to 5:00 PM
BOKOD:
Sitio Namood and
Pilpiloy, Pito
BAGUIO CITY:
Parts of Irisan
(Apugan, Purok 12,
parts of Purok 10,
parts of Cypress
Village, Cypress
Christian Foundation
School and Tengdow
Road)
Relocation of primary
pole and extension of
primary lines
LA TRINIDAD:
Parts of Alapang
(Alapang Proper and
Areas near
Barangay Hall,
Etong, Bagto) and
whole of Alno;
Reconfiguration of lines
for primary extension
TUBLAY:
Asin, Tuel, parts of
Basil (Pangablan)
SABLAN:
Whole of Balluay


(adsbygoogle = window.adsbygoogle || []).push({});

Cable & Communication Companies

In BENECO’s advisory, all concerned Cable & Communication Companies are advised to inspect and institute necessary safety measures or actions on their cables or lines attached to the affected BENECO poles.


(adsbygoogle = window.adsbygoogle || []).push({});

For other questions and concerns:

For more information and concerns, contact BENECO at any of these numbers:

  • LANDLINE: 637-4400 local 605 to 607
  • SMART: 09088657202
  • GLOBE: 09175921698


(adsbygoogle = window.adsbygoogle || []).push({});

For More News and Updates

Looking for more news and updates? Feel free to explore our BCG website and our official Facebook page. You may also check out our official BCG YouTube channel to catch a variety of video content.

SOURCE: BENECO

(adsbygoogle = window.adsbygoogle || []).push({});

For more information, see our complete guide on List of Open Establishments, Operating Hours and Mode of Service.

“`html

Tips for Managing Power Interruptions

Experiencing a power interruption can be frustrating, especially when it disrupts daily routines. To minimize inconvenience, it’s essential to prepare in advance. Start by creating a contingency plan that ensures you have adequate supplies, including flashlights, batteries, and non-perishable food items. In addition to basic necessities, consider having a portable power bank charged and ready for use, which can help keep your devices powered during outages. If you rely on medical equipment that requires electricity, make arrangements for backup power or alternative solutions. Lastly, it’s wise to stay informed about BENECO’s schedule and follow their updates to anticipate outages. This proactive approach will help you navigate these scheduled interruptions with ease and keep your household or business running smoothly.

Exploring Baguio City During Power Outages

If you find yourself affected by the scheduled power interruptions in Baguio City from February 9 to 14, 2026, consider using the downtime as an opportunity to explore the rich culture and stunning natural beauty of the city. Head over to popular tourist spots such as Burnham Park, where you can enjoy a leisurely paddle boat ride or a serene walk while soaking up the fresh mountain air. Alternatively, don’t miss a chance to visit the vibrant Baguio Night Market, which features local crafts, food stalls, and unique finds that represent the local culture. For those who enjoy nature, trek to the picturesque Botanical Garden or hike the scenic trails of Mines View Park and Camp John Hay. Taking advantage of the time away from electronics can provide a refreshing escape while you wait for the power to be restored.

“`

How do you feel about this?

Happy
3
Sad
5
Shocked
1
Not Sure
2

You may also like

Comments are closed.