BENECO and NGCP Power Interruption Schedule from January 14-17, 2026

UPDATE May 20, 2026 10:55 AM:


(adsbygoogle = window.adsbygoogle || []).push({});

As announced by the Benguet Electric Cooperative (BENECO), here are areas in Benguet that will be affected by scheduled power interruptions by BENECO and NGCP from Wednesday, January 14, 2026, to Saturday, January 17, 2026.
(function(){var s=document.querySelector(‘script[data-playerPro=”current”]’);s.removeAttribute(“data-playerPro”);(playerPro=window.playerPro||[]).push({id:”z2I717k6zq5b”,after:s,appParams:{“C_NETWORK_CODE”:”23018154962″, “C_WEBSITE”:”baguiocityguide.com”}});})();

BENECO and NGCP Power Interruption (January 14, 2026, to, January 17, 2026)

Areas AffectedPurpose
BENECO and NGCP Power Interruption Schedule
January 14, 2026
Wednesday
5:00 AM to 3:00 PM
Whole of SablanTo implement the following
activities:

1. Electrical testing and
general
maintenance of high
voltage equipment.
2. PMT of secondary
devices.
3. Correction of
identified defects at
the substation.

4. Replacement of
M2ZOC(5LI1LTR-
SAB)LTR.

5. Replacement of
drop conductors at

LBS Str.No.52A along
La Trinidad-
Sablan 69kV line.

6. Testing Load Break
Switch
DS(5LI1LTR-
SAB)BECSAB052a.

7. Energization of
Combined Instrument
Transformers (CIT) for
Hedcor Ampohaw
Metering Facility
Whole of La Trinidad EXCEPT
Beckel (Lamut area),
Parts of Ambiong LT,
Parts of Shilan (near
boundary of Lamut)
Whole of Baguio City EXCEPT
Parts of Pacdal
(Liteng, Maria Basa,
Tiptop),
Mines View Park,
Gibraltar,
Pucsusan,
Lualhati Village,
Outlook Drive,
Lucnab,
South Drive,
Parts of Cabinet Hill-
Teachers Camp
Barangay (near and
along South Drive Rd),
Country Club Village,
Happy Hallow,
DPS Compound,
Greenwater Village,
Military Cut-Off,
Sta. Scholastica Village,
Scout Barrio,
Upper Dagsian,
Lower Dagsian,
Hillside,
Gabriela Silang,
Camp 7,
Camp 8,
Poliwes,
San Vicente,
Parts of Bakakeng
Norte/Sur (Ciudad
Grande, Eagle Crest,
Montebello Village),
Loakan-Apugan,
Loakan Proper,
Liwanag-Loakan,
Atok Trail, Kias,
Fort del Pilar PMA
Whole of Tuba EXCEPT
Camp 4, Camp 3,
Twin Peaks,
Tabaan Sur, Camp 1;
Parts of Tublay: parts
of Tuel (Acop until
WINACA)
Whole of Tublay EXCEPT
Tuel and Parts of
Caponga

Whole of Bokod EXCEPT
Ambuclao and
Bobok-Bisal

Whole of Kapangan

Whole of Kibungan
EXCEPT Tacadang

Whole of Atok

Whole of Kabayan

Whole of Bakun
EXCEPT Kayapa

Whole of Buguias

Whole of Mankayan

Parts of Cervantes, Ilocos Sur
- To implement the
following activities:

1. Electrical testing and
general
maintenance of high
voltage equipment.

2. PMT of secondary
devices.

3. Correction of
identified defects at
the substation.

4. Line maintenance
works and
correction of
additional TL defects
along La Trinidad-
Sagada 69kV Line.

5. Testing Load Break
Switch DS(5LI1LTR-
SGD)MNYSGD002.
BENECO Power Interruption Schedule
January 15, 2026
Thursday
9:00 AM to 5:00 PM
Baguio City:
Parts of Kias, Whole of PMA
Relocation of pole
affected by DPWH
Project

Rerouting of
secondary lines

Rerouting of primary
lines affected by
DPWH Project
ITOGON:
Parts of Virac (parts of
Camp Suerte, Camp 5,
Camp 6, Balatoc,
Bontoc Village,
Kiangan Village,
Woodsdale, Bangen,
Jappa, Riverside,
Chosol, Anonang,
Keymen's Hill, Surong,
Skyview, Jungle Town,
Bubon, Timberyard,
Calhorr, Crosby Park,
parts of Camanggaan)
TUBA:
Tuba: Liwliw, Camp 4
January 16, 2026
Friday
9:00 AM to 5:00 PM
BAGUIO CITY:
Whole of Pacdal,
Mines View Park,
Gibraltar,
parts of Saint Joseph
Village (parts of
Siapno Rd. and
Purok 6 Navy Base),
Pucsusan,
Lualhati Village,
Outlook Drive,
Lucnab, DPS Cmpd
(near Forbes Park),
parts of Cabinet-
Teacher's Camp
(areas near Oval),
Marcoville,
Greenwater Village,
Military Cut-off
(including Baguio
Medical Center,
Sta. Scholastica,
Upper Dagsian,
Lower Dagsian,
Hillside,
Gabriela Silang,
Camp 8, Poliwes,
San Vicente, Camp 7,
parts of Bakakeng
Norte/Sur (Ciudad
Grande, Eagle Crest,
Montebello),
South Drive,
Country Club Village
(including Baguio
Country Club and
Camp John Hay),
Happy Hallow,
Apugan-Loakan,
Kadaclan Village,
Scout Barrio,
Loakan Proper,
Liwanag-Loakan,
Atok Trail;
LA TRINIDAD:
parts of Ambiong
(near Lamut) and
whole of Beckel
(except areas near
substation);
ITOGON:
Tuding, Ucab,
Gumatdang, Loacan,
parts of Tinongdan
(Boneco);
TUBA:
parts of Camp 6
(including BWD Stage
1, and areas near
Millsite);
BOKOD:
Parts of Ambuclao
(Ansodeng, Banao,
Adonot, Minac,
Lebong,
Hilltop, Campsite,
Sombrero, Ambangol)
January 17, 2026
Saturday
9:00 AM to 5:00 PM
TUBA:
Sitio Alpang, Taloy Norte
Installation of
Communal
Distribution
Transformer due to
Load Splitting and
New Connections


(adsbygoogle = window.adsbygoogle || []).push({});

Cable & Communication Companies

In BENECO’s advisory, all concerned Cable & Communication Companies are advised to inspect and institute necessary safety measures or actions on their cables or lines attached to the affected BENECO poles.


(adsbygoogle = window.adsbygoogle || []).push({});

For other questions and concerns:

For more information and concerns, contact BENECO at any of these numbers:

  • LANDLINE: 637-4400 local 605 to 607
  • SMART: 09088657202
  • GLOBE: 09175921698


(adsbygoogle = window.adsbygoogle || []).push({});

For More News and Updates

Looking for more news and updates? Feel free to explore our BCG website and our official Facebook page. You may also check out our official BCG YouTube channel to catch a variety of video content.

SOURCE: BENECO

(adsbygoogle = window.adsbygoogle || []).push({});

For more information, see our complete guide on List of Open Establishments, Operating Hours and Mode of Service.

How do you feel about this?

Happy
0
Sad
5
Shocked
0
Not Sure
1

You may also like

Comments are closed.