BENECO and NGCP Power Interruption Schedule from September 22 to 25
As announced by the Benguet Electric Cooperative (BENECO), here are areas in Baguio City and Benguet that will be affected by scheduled power interruptions by BENECO and NGCP from Wednesday, September 22, 2021, to Saturday, September 25, 2021.
NGCP Power Interruption
Date and Time | Areas Affected | Purpose |
---|---|---|
September 23, 2021 Thursday 6:00AM to 5:00 PM | WHOLE OF BAGUIO CITY EXCEPT: - Mines View Park - Pacdal - Gibraltar - Pucsusan - Outlook Drive - Lualhati Village - Lucnab - Country Club Village - Happy Hallow - South Drive - Greenwater Village - Sta. Scholastica - Hillside - Camp 8 - Poliwes - Gabriela Silang - Lower Dagsian - Upper Dagsian - Scout Barrio - Camp 7 - parts of Cabinet Hill - Military Cut-off - Bakakeng Norte/Sur (Ciudad Grande, Eagle Crest, Montebello Village) - Loakan Liwanag - Loakan Proper - Kadaclan Village | 1. Annual preventive maintenance of High Voltage Power Equipment, Protection and Statistical Meters 2. Correction of identified hotspot 3. Re-installation of detached overhead ground wire at Tower 076-077 along La Trinidad- Mankayan (Sagada) 69kV Line Segment 4. Correction of identified line defects (i.e flashover/damaged insulators & others) along La Trinidad-Sablan and La Trinidad-Mankayan (Sagada) 5. Annual Preventive Maintenance of NGCP metering equipment at BENECO- Mankayan NOTE: Normalization of La Trinidad 69kV Bus 01 and 69kV Feeders will be from (4:00 PM to 5:00 PM) |
WHOLE OF LA TRINIDAD EXCEPT: - Ambiong, LTB - Beckel |
||
WHOLE OF TUBA EXCEPT: - Tabaan Sur - Twin Peaks - Camp 1 - Ansagan - Camp 3 - Parts of Camp 4 |
||
WHOLE OF SABLAN WHOLE OF TUBLAY WHOLE OF BOKOD EXCEPT: - Parts of Ambuklao and Bobok-Bisal WHOLE OF KAPANGAN WHOLE OF KIBUNGAN EXCEPT: - Tacadang WHOLE OF ATOK WHOLE OF KABAYAN WHOLE OF BAKUN EXCEPT: - Kayapa WHOLE OF BUGUIAS WHOLE OF MANKAYAN Parts of Cervantes, Ilocos Sur |
BENECO Power Interruption
Date and Time | Areas Affected | Purpose |
---|---|---|
September 22, 2021 Wednesday 9:00AM to 5:00 PM | Parts of Poblacion and Ucab, Itogon | Line Clearing |
September 24, 2021 Friday 9:00AM to 5:00 PM | Parts of Amsing, Pacdal and Lower Navy Base, St. Joseph Village, Baguio City | Replacement of Corroded Base Steel Pole |
Parts of Country Club Village and Happy Hallow, Baguio City | Rerouting of Secondary Line | |
ITOGON: - Parts of Camisong, - Apalan - Binggo - Guesset - Boneco BOKOD: - Adunot - Banao - Minac - Sombrero - Hilltop - Ambangol - Bobok-bisal | Installation of Intermediate Pole | |
September 25, 2021 Saturday 9:00 AM to 5:00 PM | ITOGON: - Parts of Virac and Ampucao (along Philex Road) TUBA: - Parts of Camp 4 | Installation of 37.5kVA Sole-Use Distribution Transformer |
Parts of Outlook Drive and Lucnab, Baguio City | Rehabilitation of Secondary Poles and Lines |
Cable & Communication Companies
In BENECO’s advisory, all concerned Cable & Communication Companies are advised to inspect and institute necessary safety measures or actions on their cables or lines attached to the affected BENECO poles.
For other questions and concerns:
For more information and concerns, contact BENECO at any of these numbers:
- LANDLINE: 637-4400 local 605 to 607
- SMART: 09088657202
- GLOBE: 09175921698
For More News and Updates
Looking for more news and updates? Feel free to explore our BCG website and our official Facebook page. You may also check out our official BCG YouTube channel to catch a variety of video content.
SOURCE: BENECO
How do you feel about this?
Happy
0
Sad
0
Shocked
4
Not Sure
3