Uncategorized

BENECO Power Interruption Schedule for September 7 to September 12, 2020

Several areas in Baguio City and Benguet will be affected by the scheduled electric service interruption of Benguet Electric Cooperative, Inc. (BENECO) from September 7  to September 12, 2020.

BENECO Power Interruption Schedule 

These are the following areas in Baguio City and Benguet affected by the scheduled power interruption scheduled from September 7  to September 12, 2020.




ScheduleAreas Affected Purpose
September 7, 2020 (Monday)

9:00 AM – 5:00 PM

Part of Purok 5, and Tacay Road, Pinsao Proper, Baguio CityRelocation of Pole 
Parts of Strawberry Fields, Swamp Area, Betag and Palmaville, Puguis, La Trinidad
Whole of Sagpawe, Shilan, La TrinidadReplacement and Relocation of Pole
BWD Pumping Station, Camp 8, Baguio CityReplacement of Rotten Pole
September 8, 2020 (Tuesday)

9:00 AM – 5:00 PM

Parts of Upper Quezon Hill, Baguio CityRerouting of Secondary Lines
Parts of Badihoy, Guisad Surong, Baguio CityRelocation of Pole
Parts of Crystal Cave, Bakakeng Central, and Upper km, 3, Asin Road, Baguio CityRelocation of Primary Poles
Parts of Banig, Tawang, La TrinidadRelocation of Secondary Pole
Kiangan Village, Sarong, Camp Suerte, and Camp 5, Virac, ItogonReplacement of Rotten Pole
September 9, 2020 (Wednesday)

9:00 AM – 5:00 PM

Camp Dangwa, Parts of Cruz and Alapang, La TrinidadRelocation of Pole and Replacement of Rotten Pole
Whole of Monterrazas, Tuding, ItogonLine Clearing
Parts of Ampucao (near Barangay Hall), ItogonReplacement of Rotten Pole
Whole of Ud-udan, Ampucao, Itogon
September 10, 2020 (Thursday)

9:00 AM – 5:00 PM

Whole of Lexber Homes Subdivision, Banangan, SablanReplacement of Rotten Poles
Parts of Benin Road, Purok 3, Pinsao Proper, Baguio CityRelocation of Secondary Pole
Parts of Loacan Proper, Itogon-Replacement of Wooden Poles and Rehabilitation of Secondary Lines

-Line Clearing

Whole of Ambongdolan, and parts of Tuel, Tublay-Replacement of Rotten Poles

-Line Clearing

September 11, 2020 (Friday)

9:00 AM – 5:00 PM

Parts of Lamut, Beckel, La TrinidadRerouting of Secondary Lines
Parts of Monticello,Camp 7, Baguio CityUpgrading of Communal Distribution Transformer
Parts of Cabinet Hill and Teacher’s Camp, Baguio CityExtension of Primary Lines / Installation of Tree Wire (Phase 2)
Whole of Barbarit, Bagu, BakunReplacement of 13.2kV Insulators to 23kV
September 12, 2020 (Saturday)

9:00 AM – 5:00 PM

Whole of Dominican-Mirador Hill. Lourdes Subdivision Proper

Parts of: Naguilian Road (from St. Vincent towards Baguio Cemetery), MRR Queen of Peace, Campo Filipino, Lower Victoria Village, San Roque Village

-Rerouting of Primary Line and relocation of recloser

-Relocation of Pole

Pula, Saddle, Digdigwayan, Bisong, Poblacion, TubaInstallation of continuous neutral
Lower and Upper Mangga, Tuding, ItogonReconductoring of Secondary Lines

Cable & Communication Companies

In BENECO’s advisory, all concerned Cable & Communication Companies are advised to inspect and institute necessary safety measures or actions on their cables or lines attached to the affected BENECO poles.

Also, all consumers are advised to always consider all lines energized because power may be restored earlier than the scheduled time.

For other questions and concerns:

For more information and concerns, contact BENECO at any of these numbers:

  • LANDLINE:637-4400 local 605 to 607
  • SMART: 09088657202
  • GLOBE:09175921698

Source: BENECO

For more information, see our complete guide on PMA Entrance Exam Results 2019| PMAEE 2019 List of Passers.

How do you feel about this?

Happy
0
Sad
0
Shocked
0
Not Sure
0

You may also like

Leave a reply